Menu
Book
Book room DAY SPA TREATMENT Conference Biohacking Table Gift card My pages

Change language

Are you sure that you want to change language to Swedish?
Yes
No

The Front House - Hotel Tylösand’s new face

We’re expanding Hotel Tylösand again. Why?
 
Because nothing is so inspiring that it can’t be even more inspiring.
Because nothing beats getting together to meet, work and relax.  
And because everybody wants a piece of Tylösand.

NEW AND PRESENT IN HARMONY
The Front House will get the same white facing plaster as the rest of the hotel and the new building’s architecture will also connect to the present hotel’s look and feel.
 
The new five storey construction will be linked with the present entrance in a way that creates a natural connection between the two buildings, with a new green space surrounding The Front House.   

39 NEW DOUBLE ROOMS DESIGNED BY ÅSA GESSLE 
The 39 hotel rooms in The Front House are double rooms, 28 sqm big, designed by Åsa Gessle and furnished in warm, smooth colours, inspired by Tylösand’s beach, sand, and dunes.  

COMFORT, MORE COMFORT, HOTEL TYLÖSAND
Every room in The Front House has comfortable Carpe Diem beds (as in the rest of the hotel), sofa, writing desk, bathroom with twin sinks, shower, separate WC and interactive TV system for easy access to all your favourite channels. Some of the rooms also have a terrace.

CONFERENCE ROOM AND EXHIBITION
Hotel Tylösand is one of Sweden’s most popular conference hotels, and The Front House will have a new top equipped 60 sqm conference space – with new exhibition area close to the present main entrance as an extra bonus.
 
As we increase the hotel’s capacity, we will also put in more EV chargers on the parking lot.

LOCALLY GROWN, LOCALLY BUILT
Locally grown and produced is a good thing – and so is locally built. That’s why we’ve chosen local entrepreneurs for The Front House, with architects Fredblads Arkitekter, Contractors MTA Bygg & Anläggning, AB Oscar Hanson VVS, Falkenbergs Elinstallation AB, Bravida Sverige AB and AB Halmstad Kylteknik. Funktionskompaniet AB is the project manager from investment decisions to completion. All being firms from Halland.
 
The construction work started in January 2022 and is estimated to be finished during Spring 2023.

ALWAYS MOVE FORWARD, NEVER LEAN BACK
”Building The Front House as the new hotel’s new face is totally in line with our ambition never to lean back but always move forward to offer our guests an even better experience while visiting us.”
 
Elisabeth Haglund, CEO at Hotel Tylösand
 

The Front House is already open for booking. When do we have the pleasure of seeing you?
Contact us for booking inquiries: +46 35 305 05 or bokning@tylosand.se

webcam

Follow the construction of The Front House (the picture is updated every five minutes).